-
Posted: 2018/01/12 | Categories: Tenders
Tender Ref No: 000780-2018
Tender Details: Open Procedure
Work Profile:
Maritime infrastructure works for the renovation and maintenance of works on the eastern basins (Lot 1) and western basins (Lot ...
-
Posted: 2018/01/02 | Categories: Industry News
Abu Dhabi Ports Company (ADPC), the owner of Fujairah Terminals, has signed an agreement worth US$136.1 million to develop the Port of Fujairah.
Under the terms of the agreement, which is supervised ...
-
Posted: 2017/12/29 | Categories: Industry News
Georgia is one step closer to creating a new, faster maritime corridor between China and Europe, helping to restore the historic Silk Road by building the Anaklia Deep Sea Port and the construction o ...
-
Posted: 2017/12/28 | Categories: Tenders
Tender Ref No: 505085-2017
Tender Details: Reference No: UH-2017-514
Work Profile:
Dredging in the mooring fairway and Västerås and Köping ports are planned for implementation in autumn 2019. The har ...
-
Posted: 2017/12/27 | Categories: Deers' News
Recently we have produced Pneumatic Rubber Fenders for our client and also have invited BV–the third inspection party to inspect our fenders.The BV have checked the dimension, appearance, perfor ...
-
Posted: 2017/12/25 | Categories: Tenders
Tender Ref No: 505085-2017
Tender Details: Reference No: UH-2017-514
Work Profile:
Dredging in the mooring fairway and Västerås and Köping ports are planned for implementation in autumn 2019. The har ...
-
Posted: 2017/12/08 | Categories: Tenders
Tender Ref No: 476346-2017
Tender Details: Open Procedure
Work Profile:
The contracting authority would like to receive tenders for the following services:
1. Engineering design for bridges and other ...
-
Posted: 2017/12/05 | Categories: Deers' News/ News
Recently Nanjing Deers has delivered some 75Ton Bollards to our client. The material is Cast steel and the accessories is Grade 8.8 HDG. Usually the material of bollard can be Cast steel or Cast Iron. ...
-
Posted: 2017/11/24 | Categories: Industry News
Recently, cabinet approved a proposal to acquire a €8.6m land near Vassilikos, in Limassol from UK to construct an industrial and energy port that could be used by the hydrocarbon industry.
The gover ...
-
Posted: 2017/11/02 | Categories: Deers' News/ News
130pcs 4000*2200*60mm UHMW-PE pad has finished packing last week. These pads will be used together with our Cone1000H rubber fenders in the new port construction soon. Before the delivery, we have the ...
-
Posted: 2017/10/23 | Categories: Deers' News
50t T-head bollards have passed the BV testing last week. And we are ready to send them to Shanghai port now. The material of these bollards is cast steel with the 45# steel, grade 8.8 bolts, nuts and ...
-
Posted: 2017/10/22 | Categories: Tenders
Tender Ref No: 404041-2017
Tender Details: Negotiated Procedure
Work Profile:
The project includes the construction of a new quay and the dredging of the quay. The jetty will be approx. 400m. Additio ...