New construction of berth 23
Tender Ref No: 042540-2018
Tender Details: Open Procedure
Work Profile:
The entire new construction of the quay wall of the berth area or berth area is planned, including a deeply constructed crane runway on a length of 270m (9 blocks of 30m). The existing quay beam made of reinforced concrete will be partially dismantled for this purpose. A new inclined combined sheet pile wall will be placed in front of the existing sheet piling in the harbor basin. In the course of the measure, a DB track including turnouts is to be rebuilt and reconstructed with the traffic areas following the construction of the new quay.
Project Stage: Tenders Invited
Project Period: Start: 16/04/2018 – End: 21/02/2020
Area: Germany, Rostock
Tender Deadline: 05/03/2018 – 10:00 Hrs
Promoter:
Rostock Port GmbH, Ost-West-Straße 32, Rostock, 18147, Germany
Contact:
Tel: +49 381350-5122;
Fax: +49 381350-5105;
E-mail: hafenbau@rostock-port.de