Welcome to Marine Rubber Fender Supplier - Nanjing Deers Industrial Co.,Ltd

Skype: evasky86
Whatsapp: +86 13376094258
E-mail: benny@chinarubberfender.com

How to install I Type Rubber Fender?

I Type Fender Installation

The following steps are a general method for assembling and installing the I Type fender system. The actual fender design may vary depending on the situation.

 1.Check the template with the fender bolt pattern, bracket and other bolt parts. According to the design accurately positioned on the structure.
 2.Before installing the main fender system, it is advisable to install auxiliary items such as brackets and brackets. Clean the socket and check all threads before you can open the fender system.
 3.Prepare a large enough work area to pre-install the fender, away from any cutting, grinding or shot peening.
Place the fender face down to support it on a suitable load to protect the PE pad and paint.
 4.Raise the FE element to the proper position, using a soft sling or rings and rings. Be careful not to damage the rubber. Use a special washer to pass all the bolts through the fender.
MV-marine-fender 5.Attach the appropriate handcuffs to the lifting point on the panel and connect the appropriate size of the chain sling. The component weight is displayed on the drawing or available from DEERS
Leg Fenders 6.It is safe to ensure that the promotion area is clear and the promotion is starting. The long panel may require the use of a second crane for a double lift. When the label line is close to the vertical line, you can use the label line to control the panel.
Leg-Marine-Fender  7.Make sure that all fixed points are accessible, especially where there are plenty of tides. Use a label line to help guide the fender in place to avoid damage to rubber and paint.
mv fender  8.Align the bolt holes and release all the bolts (or nuts). Tighten fixed on opposite sides. The crane must support the fender system until the chain is connected and adjusted.
Prev:
Next: